Your local contact in

We look forward to receiving your enquiry

Personal details

Please fill in the mandatory field.

Please fill in the mandatory field.

Please fill in the mandatory field.

Please enter a valid email address.

Please fill in the mandatory field.

Please fill in the mandatory field.

Please fill in the mandatory field.

Which topic can we help you with?

Please fill in the mandatory field.

/ 350 Characters

Please note the maximum character length.

* Please fill the required fields

Please accept our data protection.

Unfortunately, your request could not be sent due to a system error. Please try again later.

Loading
Unfortunately, no results could be found.
All results for search term

Greater cost effectiveness in the production of large containers


6/22/22

In collaboration with development partner HAIDLMAIR, ENGEL has succeeded in reducing the cycle time for manufacturing large logistics products by 30 percent. The ENGEL duo speed high-performance machine, in combination with innovative mould technology is responsible for this performance boost.

Stackable logistics boxes pose challenges in terms of their manufacture. Work on improving production efficiency and lowering the unit costs goes on all the time. But this must not impact on product quality – after all the boxes need to be stable when filled with a heavy load and stacked high. And consistent weight is equally important. Tare values have been defined for the boxes in some industries.

One important parameter for improving productivity and cost efficiency simultaneously is the cycle time. During the K show 2022, large, multiple-use containers with a shot weight of 2000 grams are being produced in HDPE in less than 25 seconds at the ENGEL stand; this is some 30 percent faster than was previously possible. The two companies involved, ENGEL and HAIDLMAIR, have been able to set this new standard thanks to the optimum interplay between the injection moulding machine, digitalisation, automation and the high-performance mould.

High-speed operation on a small footprint

An ENGEL duo 8310/700 speed injection moulding machine is the heart of the production cell. The duo speed series was developed specifically by ENGEL to meet the requirements for extremely cost effective manufacturing of storage and transport containers as well as pails. It combines very high productivity and efficiency with a particularly small cell footprint in the high clamping force range. This means that these dual-platen machines by ENGEL are making inroads into areas that were previously the reserve of toggle-lever machines. They have the advantage of being shorter, despite having a comparable clamping force, and allow for a larger maximum opening stroke.

ENGEL duo speed injection moulding machines achieve dry cycle times of less than two seconds and ensure excellent repeatability with their stability and smooth action. One of the drivers behind this is smart pump control which, in addition to ENGEL ecodrive servohydraulics, makes a massive contribution towards these machines' great energy efficiency.

The newly developed high-speed injection unit supports an injection speed which is twice as high as that of the standard injection unit. As a result, the duo speed machines can keep pace with the trend towards even thinner wall thicknesses with long flow paths.

Reliable management of quality-relevant parameters

In addition to the precision of the duo machine's movements, smart assistance systems from the ENGEL inject 4.0 program support the excellent repeatability in the application showcased at K. They include iQ weight control, which autonomously detects fluctuations in the melt volume and material viscosity and compensates for them in the same cycle, and iQ melt control, which determines the best possible plasticising time for the application in question. Fully utilising the part’s in-mould cooling time for plasticising ensures excellent melt homogeneity.

Faster injection of large shot volumes

Technologies by HAIDLMAIR (Nußbach, Austria) make a further contribution towards the very short cycle times. The high-performance mould features a 6x FDU Midi SLS type hot runner system by HAIDLMAIR subsidiary FDU Hotrunner. This is an innovative wide-slot nozzle which, compared to legacy needle valve systems, allows large shot volumes to be injected into the cavity far faster without generating high friction energy. Additionally, hybrid inserts ensure optimum cooling and excellent heat transfer. Multiple sensors on the inside of the mould – including sensors for measuring the internal pressure, analysing the material flow and determining the crystallisation effect – contribute towards a high level of process stability.

To take the boxes off the mould, ENGEL has integrated an ENGEL easix articulated robot into the production cell. To prevent warping, the boxes, which are still hot, are first deposited in a cooling/dressing station developed by HAIDLMAIR on part removal. Up to four boxes can be cooled there at the same time. A thermal imaging camera makes it possible to actively monitor the heat distribution in the injection moulded product.

ENGEL at K 2022: hall 15, stand C58

Andreas Spicker

Marketing

+43 50 620 73825

Press Contact

We are available for further information and questions.
Contact our Press Team

Write to us

The ENGEL team will be happy to assist you with comprehensive know-how on the subject of injection moulding.

Your browser is out of date.

Internet Explorer is no longer supported. Please switch to a current browser to be able to use engelglobal.com to its full extent.